Archive for December 1st, 2007

Day 47: 16 Days Worked = + 1 / 3

This @rticle was cre@ted by Djeault, on Saturday, December 1st, 2007 at 12:42 am

These last 28 work days, I worked 14 days, thus, a day on two; since I was hired, I worked 16 days on 47, thus better than a day on three. In fact, since 2007sep24, I ‘ve worked: 47 hr ¾, thus earning over $2000, but, so far, due to usual delays, I only was paid just over a thousand $. Indeed, the first month was quite slow, but November was okay. This ending week, I was called as early as 6h18, in the morning: I was out of the door 12 minutes later. This week I worked three days on five and this Friday morning, 2007nov30, St-Louis Adult Center called me for two replacements next week.

Therefore, I can be sure that by the end of this upcoming week, I’ll have worked at least 18 days on 52, thus still better than a day on three. There are 15 work days left until the two-week long Christmas holidays: I won’t vaticinate, but I sure hope I’ll work LOTS, if not, everyday.

:-D